The framers arrived at 7:15 and there really wasn't much doubt that they had. The Sawzall made quick work of removing the ant-chewed sill and before the kids got on the bus at 8:15 the sill was replaced with wood that stood a chance of holding a nail.
The framers put down a foam layer to seal between the treated lumber sill and the foundation, and then a second untreated layer on top of the treated layer. Bolts were fastened and ground flush. The mudroom floor is now framed and tomorrow there's lots more framing to do.
No comments:
Post a Comment