Wednesday, May 6, 2009

Day 15: Backfilling the foundation

The foundation was filled in, although not before Cheryl and I were able to drop several cinder blocks and old bricks into the pit, which saves me from bringing those to Concord's drop-off/swap-off day and paying to have them thrown away. The previous owners of the house had a lot of concrete and concrete block around, we're gradually getting rid of it.

Cheryl and I are in the midst of making key decisions about windows and doors, which is harder than expected but will get done.

Foundation with backfilling almost complete

More day 15 pictures

Tuesday, May 5, 2009

Day 14: Foundation complete

permit signed off for footings, foundation, and drains

The foundation forms were stripped off and the foundation surface tuned so the framers will be happy with it. The building inspector came and signed off on the foundation, and tomorrow the backfilling will be done.

More Day 14 pictures

Monday, May 4, 2009

Day 13: Foundation walls poured

delivering the concrete for the footings

The foundation walls were poured today. The footings took 10 yards of concrete and the foundation walls required 16. That meant two cement trucks and one happy four-year-old. I'm amazed at how interesting I think the concrete work is, how the concrete guy blocks off sections where concrete shouldn't be in order to get doorways, the placement of the anchor bolts, the delivery process...

absence of concrete equals doorway

The forms get stripped tomorrow and (hopefully) the inspection of the footings and walls passes tomorrow afternoon.

More Day 13 pictures